ProjectSmith
–

Decisions

Agents propose, you decide. Approve sends it on, Edit lets you fix it first, Reject sends it back.

Follow-ups · Comms Agent

The Comms Agent finds imported RFIs and submittals that are past due and waiting on someone else, and drafts a reminder to each.

In the full app it runs by itself every weekday morning, before you get to the office.

Import the sample log

Try it: import a 10-row sample RFI log (one click, then approve), come back here, and run the agent. Watch it find the overdue RFIs and draft every reminder for you.

Sorted by priority, then soonest due.

Comms Agent·Riverside Clinic Follow-upHigh

RFI #8 is 3 days overdue — Keystone Engineering

Unblocks ceiling layout at Riverside Clinic.

A nudge to Keystone Engineering (who owes the answer), copying Summit, asking for a reply by tomorrow.

Sources: ·

Today 7:50 AM

Tone
Demo MEPRiverside Clinic
To: Keystone Engineering
Cc: Summit Plumbing & Fire
Subject: Overdue: RFI #8, sprinkler head layout at revised ceiling heights (Riverside Clinic)

Hello,

RFI #8, "Sprinkler head layout at revised ceiling heights," was due 3 days ago and is still open.

The ceiling layout in rooms 112–118 is on hold until we have your answer. Please reply by end of day tomorrow, or let us know today if you need more information from us.

Thank you.

No signature yet. Add yours in Settings and it goes under every email you approve.

Sources

  • RFI #8 log
  • Spec 21 13 13 (Wet-Pipe Sprinklers)
Submittal Agent·Riverside ClinicHigh

Drafted a reply to RFI #12

Due tomorrow

Accepts the proposed reroute of the supply duct above the corridor at grid C-4 to clear the new beam.

Sources: · · ·

Answers RFI #12

Today 9:30 AM

Demo MEPRiverside Clinic
Re: RFI #12 — Duct routing at grid C-4

Accepted. Reroute the 24x12 supply duct 18" north above the corridor ceiling to clear the new W12 beam. No change to airflow or diffuser locations. Fabrication may proceed.

Sources

  • Spec 23 31 13 (Metal Ducts)
  • Sheet M-201, grid C-4
  • Sheet S-301 (new W12 beam)
  • RFI #12 (from Apex Mechanical)
RFI Agent·Marina CommonsHigh

Send RFI #14 — sprinkler main vs. beam

Due in 2 days

Sprinkler main conflicts with a beam at Level 3, grid F-7. Suggests lowering the main 6".

Sources: · · ·

Sends RFI #14

Today 7:30 AM

Demo MEPMarina Commons
RFI #14 — Sprinkler main conflict at Level 3, grid F-7

The 4" sprinkler main as drawn conflicts with the W16 beam. We suggest lowering the main 6" below the beam. Please confirm or advise.

Sources

  • Sheet FP-301, grid F-7
  • Sheet S-203 (W16 beam)
  • Spec 21 13 13 (Wet-Pipe Sprinklers)
  • Field note, Level 3 walk
Comms Agent·Riverside Clinic

Drafted today's field report — Riverside Clinic

Due tomorrow

Level 2 above-ceiling and rooms 112–118: 3 observations, 2 issues, 3 follow-ups. Filed in the Daily Log once you approve.

Sources: · · ·

Open the report

Today 11:20 AM

Demo MEPRiverside Clinic
Riverside Clinic — field report
Area: Level 2 above ceiling, and rooms 112–118
Weather: 48°F, overcast, dry
On site: Apex Mechanical (6), Summit Plumbing & Fire (3), Brightline Electric (4)

Observed
1. Level 2 supply main installed from grid 1 to grid 3. The section at C-4 is staged but not hung, waiting on the RFI #12 answer.
2. Fire dampers installed at grid lines 3 and 5. No access doors in the duct at either damper yet.
3. Rooms 112–118 framed for the 8'-6" ceiling (ASI-6). Sprinkler drops still cut for 9'-6".

Issues
• Access doors missing at the fire dampers on grid lines 3 and 5 (Spec 23 33 00).
• Sprinkler drops in rooms 112–118 too short for the new ceiling; on hold until RFI #8 is answered.

Follow-ups
• Install access doors at FD grid lines 3 and 5 (Apex, 7 days)
• Add the access-door note to the Level 2 duct shop drawing review (us, 4 days)
• Hold sprinkler drops in rooms 112–118 until RFI #8 is answered (Summit, tomorrow)

14 photos attached.

Sources

  • Field notes, Riverside Level 2 walk
  • Site photos, Riverside (14)
  • Spec 23 33 00 (fire dampers)
  • RFI #8 log
Comms Agent·Marina Commons

Drafted minutes for OAC meeting #6

Due in 2 days

4 decisions and 4 action items, each with an owner and due date. Goes to all attendees once you approve.

Sources: · · ·

Open the meeting

Yesterday 4:40 PM

Demo MEPMarina Commons
Marina Commons — OAC meeting #6 minutes
Site trailer + Teams, 10:00 AM
Present: Marina Commons Partners (Owner), Coastline Construction (GC), Northwind MEP Engineers, our firm. Absent: Summit Plumbing & Fire.

Decisions
1. Lower the 4" sprinkler main 6" below the W16 beam at F-7, pending Northwind's answer to RFI #14. Head layout unchanged.
2. Level 3 sprinkler rough-in stays on hold until RFI #14 is answered.
3. Northwind to return the Level 1–2 sprinkler shop drawing review by next Friday.
4. Generator resubmittal is under review; no schedule change yet.

Action items
• Send RFI #14 to Northwind (us, 2 days)
• Confirm Level 3 ceiling height below the beam (Coastline, 3 days)
• Return sprinkler shop drawing review 21 13 13-01 (Northwind, 5 days)
• Update the 3-week look-ahead for Level 3 sprinkler rough-in (us, 4 days)

Next meeting: OAC #7, same time next week. Please send corrections within 2 business days.

Sources

  • OAC #6 agenda
  • Meeting notes, OAC #6
  • RFI #14 · Marina Commons
  • Submittal 21 13 13-01
Comms Agent·Riverside Clinic Follow-up

Submittal 23 36 00-01 (VAV terminal units) has been with Apex Mechanical for 6 days

Equipment release for Riverside Clinic slips if this passes Friday.

A short check-in asking Apex when the revised VAV package will be resubmitted.

Sources: ·

Today 7:52 AM

Tone
Demo MEPRiverside Clinic
To: Apex Mechanical
Subject: Resubmittal needed: 23 36 00-01, VAV terminal units

Hello,

The VAV terminal unit submittal (23 36 00-01) was returned "Revise & resubmit" 6 days ago. Please send the revised package by Friday so the equipment can be released on schedule.

Thank you.

No signature yet. Add yours in Settings and it goes under every email you approve.

Sources

  • Submittal 23 36 00-01 log
  • Spec 23 36 00 (Air Terminal Units)
Scheduler Agent·Oak St. Warehouse

Move Crew B to Oak St. Warehouse Mon–Tue

$6,400Due in 3 days

Fixes a double-booking. Riverside Clinic keeps Crew A; no overtime needed.

Sources: · ·

Today 9:00 AM

Demo MEPOak St. Warehouse
Schedule change

Crew B: Riverside Clinic → Oak St. Warehouse, Monday–Tuesday.
Crew A stays on Riverside Clinic.
No overtime required.

Sources

  • Oak St. 3-week look-ahead
  • Crew calendar, week 46
  • Riverside schedule, Level 2 duct install
Submittal Agent·Riverside Clinic

Review of Level 2 ductwork shop drawings

Due in 4 days

Recommends "Approved as noted": the C-4 reroute matches RFI #12, with two notes to add.

Sources: · · · ·

Returns submittal 23 31 13-02

Today 8:15 AM

Demo MEPRiverside Clinic
Review of 23 31 13-02 — Ductwork shop drawings, Level 2

Approved as noted. The reroute at grid C-4 matches the RFI #12 response. Add access doors at the fire dampers on grid lines 3 and 5. Confirm 1" duct liner on the supply mains, per spec section 23 31 13.

Sources

  • Spec 23 31 13 (Metal Ducts)
  • Spec 23 33 00 (fire dampers)
  • Sheet M-201, grid C-4
  • RFI #12 (reroute at C-4)
  • Submittal 23 31 13-02
Estimator Agent·Oak St. Warehouse

Priced change order #7 — RTU-2 feeder upsize

$4,860Due in 5 days

Prices the bigger feeder from RFI #10 at $4,860 and 1 added day. Ready to send to the owner.

Sources: · · · ·

Sends change order #7

Today 10:05 AM

Demo MEPOak St. Warehouse
Change order #7 — Upsize RTU-2 feeder after equipment substitution

Replace the 40 A feeder with #4 Cu on a 70 A breaker to serve the approved RTU-2 substitution (MCA 68 A), per RFI #10.

Labor (14 hrs): $1,540 · Material: $2,780 · OH&P 12.5%: $540 · Total: $4,860. Schedule: +1 day.

Sources

  • Spec 26 05 19 (conductors)
  • Sheet E-301 (RTU-2 feeder)
  • RFI #10 (RTU-2 feeder size)
  • RTU-2 cut sheet (MCA 68 A)
  • Labor rates, current year
Estimator Agent·Oak St. Warehouse

Finished estimate for Oak St. Warehouse

$412,800Due in 6 days

First-pass estimate of $412,800 (HVAC + plumbing). 4 assumptions listed.

Sources: · · · ·

Yesterday 3:20 PM

Demo MEPOak St. Warehouse
Oak St. Warehouse — First-pass estimate

HVAC: $268,400
Plumbing: $144,400
Total: $412,800

Assumptions: existing gas service is adequate; no seismic bracing; standard working hours; roof curbs by others.

Sources

  • Sheets M-101 to M-401, Rev 2
  • Sheets P-101 to P-301, Rev 2
  • Spec 23 05 00 and 22 05 00
  • Bid E-38 (Riverside plumbing take-off)
  • Supplier quote Q-4471